Induction (2)

Client:                                 Kane Constructions Pty Ltd
Project:                               LDS Mudgeeraba
Duration:                            August 2010 to October 2011
Project Value:                   $1,400,000
Project Details:                 Main Constructions was fortunate enough to successfully tender this project which we had set our sights on from the beginning. We were honored by being selected as one of three nominated preferred civil contractors for this project. The construction of the meetinghouse is schedule for 52 weeks of construction and we will be covering all of the bulk earthworks, civil storm water/drainage and construction of the driveway/car parking lot. This is a large site with an extensive scope of works. The total asphalt surface alone is almost 8000m² and includes concrete footpath and stair construction with kerbs and traffic islands.

Back
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
Latter Day Saints Mudgeeraba
Detail Download
 
 
Powered by Phoca Gallery