Client:                                  WATPAC Specialty Services Pty Ltd          

Project:                               Coolum Beach Retail Development, Coolum Beach

Duration:                            May 2009 to November 2009

Project Value:                    $420,000

Project Details:             Our contract wad to undertake the bulk earthworks, civil storm water with a 30,000 litre special design rain harvesting system, 45 bay car parks with both new construction and overlay work on existing asphalt. During construction we had to face huge challenges due to the the tidal site conditions and both sand and hard basalt rock to contend with our work was cut out in creating the building platforms all under Level 1 Supervision.

Back
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
Coolum Beach Retail Development
Detail Download
 
 
Powered by Phoca Gallery