Client: Royal Wolf
Project: Royal Wolf Stormwater Drainage Upgrade
Duration: May 2016 - Jul 2016
Project Value: $ 250,000
Project Details: Royal Wolf engaged Main Constructions to undertake drainage upgrade works at their depot in Banyo.The existing drainage was inadequate for the requirements of the site. This project involved the installation of a Humes Jellyfish tertiary treatment device which is a stormwater treatment system featuring membrane filtration which provides exceptional pollutant removal. The system uses gravity, flow rotation and up-flow membrane filtration to provide tertiary treatment to stormwater in an underground structure. Other works included earthworks and he installation of a concrete lined drainage channel and inlet basin. Works were completed in stages so as not to interfere with the company’s operations and additional works required on site by other contractors.
We are working hard at South Pine Sports Complex to finalise construction of the new soccer facilities. These facilities which include a High Performance Club House and a Local Club House facility along with 4 new soccer fields will provide a much welcome addition to the complex. We are sure that after the excitement of the World Cup Soccer recently held in Australia that soccer clubs will be receiving an influx of players.
28/09/2023